VW Passat B5

since 1996 release

Repair and operation of the car



Foltsvagen Passat B5
+ Maintenance instruction
+ 1. Maintenance
+ 2. Engines
+ 3. Cooling system
+ 4. Fuel system
+ 5. Engine management
+ 6. Exhaust system
+ 7. Transmission
+ 8. Running gear
+ 9. Steering
+ 10. Brake system
+ 11. Body
- 12. Heating, ventilation
   12.2. Ventilating nozzles
   12.3. Control panel of a heater
   12.4. Lever of the central gate
   12.5. Control unit of a heater
   12.6. Block of resistors of a heater
   12.7. Control unit of a heater and conditioner
   12.8. Conditioner compressor
   12.9. Heater fan
+ 13. Electric equipment






12.5. Control unit of a heater

GENERAL INFORMATION

Control unit of a heater

1 – case of the control unit of a heater,
2 – illumination lamp,
3 – side rotary handles,
4 – central rotary handle,
5 – decorative overlay of the control panel of a heater

Cable of management of system of heating and ventilation

1 – a cable with a cover of white color, the managing director of the gate "in leg/defrosting",
2 – a cable with a cover of black color, the managing director of the central gate,
3 – a cable with a cover of red color, the managing director of the gate regulating temperature of the air given to salon
4 – control unit of system of heating and ventilation,
5 – elements of fastening of a cable and cover of a cable

Fastening of cables of management to the heater block


1 – a cable with a cover of black color, the managing director of the central gate,
2 – a cable with a cover of white color, the managing director of the air temperature gate,
3 – the rounded-off end of a cable
 

Fastening of a cover of a cable of control of the heater block

1 – holder,
2 – clamp case

Fastenings of a cable of control of the air temperature gate

1 – holder,
2 – heater case

Removal

PERFORMANCE ORDER
1. Take the control unit of a heater from the dashboard.
2. Remove plastic or metal clips, the fixing covers of cables of management to the control unit case.
3. Remove the rounded-off ends of cables from control unit levers.

Installation

PERFORMANCE ORDER
1. Install the rounded-off ends of cables on control unit levers, then fix covers of cables by clips.
2. For fastening of a cover of a cable of management insert the holder of a cable (1) into the case of a clamp (2) to a zashchelkivaniye of the holder of a cable, see rice. Fastening of a cover of a cable of control of the heater block.
3. For fastening of a cover of the cable operating the gate of temperature implant a leg of the holder (1) into a groove (V) and, having turned it counterclockwise (And), record on the heater block case, see rice. Fastenings of a cable of control of the air temperature gate.