1 – overlay of a forward door, 2 – the aligning ledge, 3 – the aligning ledge,
4 – overlay of a back door, 5 – protective film
Prevention
Slips 1 and 4 – self-adhesive. Centering is carried out by ledges 2 and 3.
Removal
PERFORMANCE ORDER
1. Gradually warming up the hair dryer an overlay of a door, soften the gluing layer of a slip and remove a slip from a door.
2. Clear a surface on a door for installation of a slip, at first gasoline, and then means for removal of silicone. Wipe and dry the cleared door surface.
Installation
PERFORMANCE ORDER
1. Remove a protective film from a slip.
2. Establish an overlay for a door and by force press it.